Engineering BOM Manager (PDE)
Collaborate throughout the Enterprise from a Single Definition of Engineering Parts and Bill Of Materials
- On-premises
- On-cloud
What does PDE do?
Focus on Added-Value Activities Eliminate the manual, time consuming and error prone collection and update of product information from multiple data sources.
Shorten Development Time and Costs Reduce the proliferation of components by searching across enterprise data sources to find and reuse existing parts.
Build Products Right the First Time Correctly select qualified, approved and preferred components.
Validate Changes Engage interactive 3D visualization to see the impact of a change on both the design and bill of materials at the same time.
Improve Decision Making Analyze tabular views along with 3D graphics to Identify component usage, highlight differences between BOMs and summarize design changes over time.
DatasheetEngineering BOM Manager (PDE) datasheetPDF, 4 pages, 0.2 MB Download the datasheetApps included
My ECR ECOsENOVIA
Compare to other Engineering BOM Management roles
A dot marks each app a role includes.


